The opening perspective
Climate risks belong in the design, budget and operating plan of an asset, with responsibility for acting when conditions change.
Start with the site and the service
Assess the hazards relevant to the location and the people relying on the service. A flood may damage equipment, close an access route or interrupt a supply chain. These consequences may require different responses.
Record the assumptions and information used. A general statement that a project is resilient is less useful than an account of the conditions it has been designed to withstand.
Compare costs over the asset’s life
A protective measure may add to initial construction costs while reducing expected damage or disruption later. Compare those costs, uncertainty and operating demands rather than assume resilience is either free or always unaffordable.
Agree who maintains the measure, what will be monitored and when the design should be reviewed. An adaptation plan needs a budget and a decision process if it is to remain useful after construction.
An advisory perspective from Subway Labs Infrastructure Partners on the decisions behind project preparation, funding and delivery.

